• World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props
  • World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props
  • World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props
  • World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props
  • World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props
  • World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props

World Manufacturer of Mining Machines, Underground Mining, Monolithic Hydraulic Struts Supporting The Top of The Tunnel, Individual Hydraulic Props

Warranty: One Year
Certification: CE, ISO 9001:2000
Standard: AISI, ASME, GB
Surface Treatment: Polishing
Manufacturing Process: Casting
Material: Cast Steel
Customization:
Gold Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Parameters
Overview

Basic Info.

Model NO.
K44
Core Components
Pump
Max Height mm
650
Rated Working Pressure MPa
49
Min Height mm
510
Rated Working
250
Transport Package
Steel Pallet or Customized
Specification
according to product size
Origin
China
HS Code
730890000
Production Capacity
10000 Sets/ Year

Product Description

Product Parameters

 

Pillar transportation and storage
(1) When the pillar is transported, the pillar should be reduced to the minimum height;
(2) Use a special hydraulic prop transport vehicle, and it must be handled with care during installation and disassembly, and it is strictly forbidden to drop it;
(3) Pillars should be stored in a dry room not lower than 0ºC;
(4) For pillars that are not in use for a short period of time, the water (or emulsion) in the pillar cavity should be cleaned, the surface of the cylinder body should be
washed and dried, and the liquid inlet of the three-way valve should be blocked to prevent stolen goods from entering;
(5) The pillars stored in the groove on the working face should be erected and neatly arranged;
(6) The number of spare pillars in the well generally does not exceed 5% of the working face usage.

 
Category Malfunction cause of issue Solution
Lifting column
failure
The movable post does not protrude from the cylinder body or protrudes very slowly when supporting No pressure or low pressure in the pumping station;
The shut-off valve is closed;
The injection valve nozzle is blocked by dirt;
Clogged pipeline filter
Check the pumping station;
Open the shut-off valve;
Clean the injection valve nozzle;
Clean the filter
Back column failure
Slow or no drop of the moving column
The return spring is dropped or damaged;
The cylinder has a partial depression;
Damage to the surface of the live post
Re-hang the return spring orreplace with a new spring;
Replace damaged parts
Seal failure 1. Liquid leakage from the handle;
2. Liquid leakage from the base;
3. Liquid leakage from the φ42 hole on the column head;
4. Leakage from check valve or unloading port
The Y-ring is damaged, the oil cylinder is deformed or the coating falls off;
The base φ100×3.1 O-ring is damaged;
φ42×3.5 O-ring is damaged;
Check valve, unloading valve is damaged
Replace the Y-ring, replace the cylinder;
Replace the O-ring;
Replace with new valve or clean one-way valve, unload valve pad
FAQ

Q1:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q2:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.


Q3:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now