• Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support
  • Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support
  • Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support
  • Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support
  • Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support
  • Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support

Quarry Type Double Telescopic for Coal Mining Suspension Dw Single Hydraulic Prop Mine Support

After-sales Service: Remote Service
Warranty: One Year
Certification: CE, ISO9000
Standard: AISI, ASME, GB
Surface Treatment: Polishing
Manufacturing Process: Casting
Customization:
Gold Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Parameters
Overview

Basic Info.

Model NO.
FBCDZ
Material
Carbon Steel
Core Components
Pump
Max Height mm
650
Rated Working Pressure MPa
49
Applicable Industries
Construction Works/Energy/Miming
Min Height mm
510
Transport Package
Steel Pallet or Customized
Origin
China
HS Code
730890000
Production Capacity
10000 Sets/ Year

Product Description


Precautions for the use of pillars
(1) When the pillar is in use, do not use it at the highest height;
(2) Pillars should generally be used in conjunction with metal hinged top beams;
(3) For new pillars and pillars used for the first time after restoration, the air in the inner cavity of the pillars shall be discharged;
(4) When supporting the pillar, flush the liquid injection valve body of the one-way valve with a liquid injection gun to avoid coal dust pollution and affect the
performance of the valve;
(5) When supporting pillars, the direction of the liquid injection valve body of the three-way valve is toward the downward groove direction of the working surface;
(6) Special drifting jacks should be used for migration, and the waist of the pillar should not be used as the fulcrum of migration;
(7) Hard objects such as hammers and picks are not allowed to knock the cylinder body and three-purpose valve;
(8) The retracted pillars should be lowered to the lowest height, and immediately placed on the side against the old lint. It is forbidden to throw them on the bottom
plate;
(9) Liquid injection guns are not allowed to be placed randomly. After injection, they should be hung on the handle of the second row of pillars;
(10) When crushing, it is strictly forbidden to use blasting or deadlift with a post-returning machine. Undercover methods should be used to loosen the pillars and then pull them out.
Solution Category Malfunction cause of issue
Check the pumping station;
Open the shut-off valve;
Clean the injection valve nozzle;
Clean the filter
Lifting column
failure
The movable post does not protrude from the cylinder body or protrudes very slowly when supporting No pressure or low pressure in the pumping station;
The shut-off valve is closed;
The injection valve nozzle is blocked by dirt;
Clogged pipeline filter
Re-hang the return spring orreplace with a new spring;
Replace damaged parts
Back column failure
Slow or no drop of the moving column
The return spring is dropped or damaged;
The cylinder has a partial depression;
Damage to the surface of the live post
Replace the Y-ring, replace the cylinder;
Replace the O-ring;
Replace with new valve or clean one-way valve, unload valve pad
Seal failure 1. Liquid leakage from the handle;
2. Liquid leakage from the base;
3. Liquid leakage from the φ42 hole on the column head;
4. Leakage from check valve or unloading port
The Y-ring is damaged, the oil cylinder is deformed or the coating falls off;
The base φ100×3.1 O-ring is damaged;
φ42×3.5 O-ring is damaged;
Check valve, unloading valve is damaged
 
Product Parameters

 

Back column
(1). Insert the withdrawal hook into one end of the unloading port on
the pillar.
(2). The operator should stand in a safe position, move the upward
plate to retract the hook, the emulsion in the column will be dis-
charged from the liquid inlet nozzle and drop the column, and then
return to the column.
(3). The pillars that have been returned should be stored on the work-
ing surface with their heads up to avoid soiling the cutting.



FAQ

Q1:What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structures in the field of housing, multi-story structure, high-rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures, etc.

Q2:What can you do for us?
AWe offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
BWe sell our products to contractors, building companies, material suppliers, or trading companies.
CWe support our worldwide peer companies with our outstanding formwork or scaffolding products.
DWe provide remote or on-site instruction to the builders.


Q3:How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of the construction project.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now